Foundation ditch dredging project for Yangjiang nuclear power marine phase I Project
Total investment of the project: commenced in October 2004 for a year or so.
2018-10-30
Total investment of the project: commenced in October 2004 for a year or so.
Project location: Dongping Town, Yangjiang City, Guangdong Province
Project contents:
1. the engineering section is 980 meters long, and the water depth is excavated in the 7~8 meter trough.
2. dig the foundation trench according to the design drawings and transport the remaining mud to the dumping area.
Related
It has superior construction and ship docking sites.
The factory is close to the Xijiang sub-channel, with superior construction and ship berthing sites, easy to go to sea, only 15 nautical miles from the waters of Macao, with natural geographical advan
2018-10-30
The company attaches importance to production safety, constantly improve the internal rules and regulations of the enterprise, resolutely implement the "scientific management, quality-oriented, custom
2018-10-30
Since its inception, under the leadership of the chairman, general manager and factory director, our company has been producing in strict accordance with the requirements of China Shipbuilding Quality
2018-10-30